IMPLEMENTASI METODE RELIABILITY CENTERED MAINTENANCE PADA KOMPONEN KRITIS TURBIN UAP DI PT MADUBARU

Maria Eva Susanti Lelu, Widya Setiafindari

Abstract


IMPLEMENTATION OF RELIABILITY CENTERED MAINTENANCE METHOD ON CRITICAL COMPONENTS OF STEAM TURBINE AT PT MADUBARU

Steam turbine is a machine that can be used to convert heat energy from steam into mechanical energy so that it can produce electrical energy. As a source of electrical energy, PT Madubaru utilizes this steam turbine. The purpose of this research is to determine the Mean Time To Failure or MTTF and Mean Time To Repair or MTTR values and which components of this steam turbine have the highest Risk Priority Number (RPN) based on FMEA analysis. This study uses FMEA analysis and the Reliability Centered Maintenance (RCM) method. From the results of data processing that has been done it is known that the most critical component is the coupling component with a damage percentage level of 21.62% of the other components. Based on the calculation of the MTTF value, the result is 1863.74, this means that the coupling component needs to be maintained or checked after operating for 1863.74 hours or around 77,656 days. In addition, for the calculation of the MTTR value, the result is 0.7941 hours, which means that the coupling component takes 0.7941 hours to repair. While the FMEA analysis showed that the coupling component received the highest RPN value of 24 out of the other components. The cause that occurred was due to a broken coupling membrane which hampered the production process because it was necessary to repair the component.


Keywords


Turbin Uap; Reliability Centered Maintenance; FMEA; Diagram Pareto; Perawatan; Steam Turbine; Maintenance;

Full Text:

PDF

References


S. S. Patil, A. K. Bewoor, R. Kumar, M. H. Ahmadi, M. Sharifpur, and S. PraveenKumar, “Development of Optimized Maintenance Program for a Steam Boiler System Using Reliability Centered Maintenance Approach” Sustain., vol. 14, no. 16, 2022, doi: 10.3390/su141610073.

I. G. Panjaitan and F. A. Kurniawan, “Analisis Pemeliharaan CGR(Compact Gas RAMP) Menggunkan Metode Reliability Centered Maintenance (RCM) Di PLTMG Balai Pungut – Duri,” vol. 17, no. 3, pp. 1–5, 2022.

S. Kasus, P. T. Nusa, and I. Jaya, “Perencanaan Perawatan Mesin dengan Pendekatan Metode Reliability Centered Maintenance ( RCM ) dan Maintenance Value Stream Map ( MVSM ),” vol. 7, 2022.

M. Rcm, R. Centered, and M. Di, “Analisis Sistem Perawatan Mesin Bubut Menggunakan RCM” vol. 2019, no. September 2019, pp. 39–48, 2021.

T. H. Ardhi, “Minimasi Downtime Pada Unit Shore To Ship Dengan Metode Reliability Centered Maintenance (Rcm) Di Pt. Mitra Sentosa Abadi,” JISI J. Integr. Sist. Ind., vol. 6, no. 2, pp. 127–133, 2019, [Online]. Available: https://jurnal.umj.ac.id/index.php/jisi/article/view/4907

L. Hakim, “Implementasi RCM pada mesin diesel Deutz 20 kVA,” vol. 10, no. 1, pp. 42–52, 2021.

A. H. Cahyono, “Vocational Education National Seminar ( VENS ) Perawatan preventif van-belt pada mesin Ultra Hight Frequency ( UHF ),” pp. 121–125, 2022.

R. Dwi Irawan, “Analisis Perawatan Mesin Yilmak Laundry dengan Metode Reliability Centered Maintenance (RCM) dan Risk Based Maintenance (RBM) (Studi Kasus : Departement Laundry PT. Eratex Djaja),” J. Energy J. Ilm. Ilmu-Ilmu Tek., vol. 12, no. 1, pp. 16–21, 2022.

J. Dias, E. Nunes, and S. Sousa, “Productivity improvement of transmission electron microscopes - A case study,” Procedia Manuf., vol. 51, no. 2019, pp. 1559–1566, 2020, doi: 10.1016/j.promfg.2020.10.217.

D. Erawadi, T. Artono, I. N. Rianza, and A. Halim, “Penentuan Interval Waktu Preventive Maintenance Mesin Dengan Tindakan Berdasarkan Metode Reliability Centered Maintenance ( RCM ) Pada PT PLN (Persero) UPK Bukittinggi,” vol. 14, no. 1, pp. 41–55, 2022.




DOI: https://doi.org/10.34001/jdpt.v14i2.4736

Article Metrics

Abstract view : 142 times
PDF - 90 times

Creative Commons License
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.

Disprotek Indexed by:

1 Google Scholar  2 BASe3 Onsesearch 4 Garuda 5 Sinta 6 Dimensions7 Crossref 8 JurnalStories 9 ROAD 10 ICE11 ORCID  

Visitor Statistics
Web
Analytics Made Easy - StatCounter
Flag Counter

Lisensi Creative Commons

DISPROTEK: Journal of Informatics Engineering, Information Systems, Electrical Engineering, Industrial Engineering, Civil Engineering, and Aquaculture is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.